Small firm customer care with large firm capabilities


Home The Firm Staff Projects News Contact



ENERGY MODELING PROJECTS

Energy Modeling and Simulation for LEED EA prerequisite 2:

Minimum Energy Performance Template (EAp2), and for EAc1, Optimize Energy Performance, for five supermarket projects: Sao Camilo, Tolle Recife, Tambore, flamboyant, each approximately 5,220 m2 , in Sao Paulo, including refrigerant process energy use reduction exceptional calculation for each supermarket.

Building Energy Modeling and Simulation for LEED EAp2 and for EAc1 for Tulip Tree Hall at Indiana University.

Building Energy Modeling and Simulation for LEED EA prerequisite 2:

Minimum Energy Performance Template (EAp2), and for EAc1, Optimize Energy Performance, for the project known as Estudio I/J, a television studio building.

Energy Modeling and Simulation for the new W Tower Morumbi:

A 170,000 m2 Core & Shell project. Fortier Engineering provided a preliminary energy model for the envelope of this project.

Raymond Auto Parts:

Building Energy Modeling and Simulation for LEED EA prerequisite 2: Minimum Energy Performance Template (EAp2), and for EAc1, Optimize Energy Performance, for an auto parts Industrial building of approximately 10,800 m2 , including exceptional calculations for three separate processes.

Building Energy Modeling and Simulation for Ambulatory Care Ambulatory Clinic Buildings 1, 5, and 6,for the purpose of Estidama certification, in Abu Dhabi, UAE.

Building Energy Modeling and Simulation for LEED EA prerequisite 2:

Minimum Energy Performance Template (EAp2), and for EAc1, Optimize Energy Performance, and for SSc8 as it relates to EAp2 and EAc1, for Tower 4 project in Sao Paulo, an office tower of approximately 400,000 ft2.

Building Energy Modeling and Simulation for Ambulatory Clinic Buildings 4, 7, and 9, in Abu Dhabi, United Arab Emirates.

Building Energy Modeling and Simulation for EPACT 179D tax deductions for IPS #103 (Indianapolis Public Schools).

Millwood, West Virginia Armstrong Plant:

Energy modeling for LEED EAp2 and EAc1, including exceptional calculation for process savings, and commissioning work for fundamental and enhanced commissioning.

Building Energy Modeling and Simulation for LEED EA prerequisite 2:

Minimum Energy Performance Template (EAp2), and for EAc1, Optimize Energy Performance, for the Kraft food processing plant, including exceptional calculation for process savings.

Building Energy Modeling and Simulation for EPACT 179D tax deductions for FEMA Buildings B, C, D, & F.

Proposal related to Building Energy Modeling and Simulation for LEED EA prerequisite 2 and for obtaining credits under EAc1:

Minimum Energy Performance Template (EAp2), for the Vargas Tower located in Rio De Janeiro.

Schrott Center for Performing Arts at Butler University - LEED Energy Modeling.

Forest Dining Center at Indiana University - LEED Energy Modeling for EAp2 and EAc1.

Indianapolis Public Schools IPS # 105 - LEED Energy Modeling for EAp2 and EAc1.

Building Energy Modeling and Simulation for EPACT 179D tax deductions for New Kankakee Valley Middle School.


DESIGN & CONSULTING PROJECTS

Housing Authority City of Pittsburgh:

Mechanical systems renovation of two fire damaged units at Homewood North.

Pittsburgh Public Schools:

Southbrook / Pioneer Data Closet Ventilation - Design of ventilation for cooling for an existing data closet.

Ross Ford Addition and Renovation, plumbing and roof drainage system design.

Rivertech office building: new 11,000 ft2 building - mechanical systems design.

Community Day School Tunnel:

Design of electric heat for tunnel at Community Day School.

South Hills Honda Dealership: Mechanical systems design.

Carnegie Mellon University:

161 Baker Hall Renovations - Design for plumbing, fire sprinklers, and HVAC.

Carnegie Mellon University:

300 S. Craig St. First Floor Renovations - Design for plumbing, fire sprinklers, and HVAC.

Pittsburgh Public Schools:

Obama (Peabody) ECC, mechanical systems design for renovations to create an Early Childhood area within the building.

Pittsburgh Public Schools:

Milliones Security Room HVAC, Design of increased cooling for security room.

Addison Terrace, Phase I:

HVAC. Plumbing, and fire sprinkler design for a 186 unit townhouse development.

Carnegie Mellon University:

4615 Forbes 4th Floor Renovations. Design for plumbing, fire sprinklers, and HVAC.

Specifications and analysis work related to the roof replacement at Northview Heights, Housing Authority City of Pittsburgh (HACP) guaranteed energy savings performance contract report.

Mechanical Systems Survey & Report for Poale Zedeck Synagogue.

Pittsburgh Public Schools:

Pittsburgh Roosevelt Elementary School. Project for AHU changes for code permitted location of duct smoke detectors.

238 Atwood Apartments:

Design of plumbing and HVAC systems for 6 unit apartment project.

Review of guaranteed energy savings agreement and report of requirements related to the roof replacement at Northview Heights housing project, Housing Authority City of Pittsburgh.

Liberty Park Phase II:

Mechanical systems design for 71 unit residential project.

Dollar Tree:

Mechanical Systems Design, including plumbing, HVAC, and fire sprinklers, for renovation of a building area of approximately 10,000 ft2 into a retail store.


Home | The Firm | Staff | Projects | News | Contact

5889 Forbes Avenue, Suite 330
Pittsburgh, PA 15217